Working on the shop, got the electric, 3 phase up and working, AC and ceiling fans up and running, walls and ceiling white washed. The floors are all painted with epoxy, the Bridgeport is set and leveled. The mill obviously set up inactive for some time and needed a good oiling with Mobil 1 synthetic to get the oil in the oilers flowing correctly. The air compressor bolted down loosely as required with the air system connected and all working correctly but one of 10 outlet leaks and will require the replacement of a PVC fitting. About time to order the completed inspection.
Ed
Ed